Home Hero

23 November 2020

Related Posts

New Building Architectural Rendering (Lotus)
ISOLA ANNOUNCES NEW HEADQUARTERS LOCATION IN CHANDLER WITH 118,000 SQUARE FOOT LEASE
https://www.isola-group.com/wp-content/uploads/home_hero.mp4 Chandler, Arizona, (August 27, 2019): Isola Group has completed a 118,000-square-foot lease to remain in Chandler and relocate its Corporate Offices, R&D and manufacturing operations. The company will be moving the Corporate Offices on October 7th, 2019 into a newly constructed industrial building at the Lotus Project,…
Why So Many Circuits ML Blog
Why So Many Circuit Materials?
https://www.isola-group.com/wp-content/uploads/home_hero.mp4 Printed electronic circuits are part of everything we do, in growing numbers of electronic devices for computing, communications, transportation and many other functions. Those circuits, once so simple, now embrace many technologies, including analog, digital, DC power, and RF/microwave signal paths. To design printed circuit boards (PCBs)…
A Tour of the New Isola Factory: Investing in North America
A Tour of the New Isola Factory: Investing in America
https://www.isola-group.com/wp-content/uploads/home_hero.mp4 I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team persevered and the…