Isola Foundations Icons Red Applications HighSpeedDigital Small
08 December 2020
Related Posts
Jeff Waters Interviewed by Signal Integrity
Signal Integrity Journal recently caught up with Jeff Waters to check in on his progress over the last two years since he took over as president and CEO of Isola Group discussing improvements in their operations and new products.
PCB007 Interview with Travis Kelly: Maintaining Continuity of Supply
On April 9, Barry Matties spoke with Travis Kelly, Isola president and CEO. Travis gave an update on Isola’s responses to the COVID-19 challenges in materials manufacturing. Travis discusses how Isola is managing their supply chain by leveraging our global footprint to to fulfill increasing…
A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…