2019 DesignCon Logo 235×57

2019 DesignCon Logo 235x57

02 January 2019

Related Posts

A Tour of the New Isola Factory: Investing in North America
A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…
Pcb007
Heading Into 2020 with Isola
PCB007 interviews CEO Travis Kelly and CSMO Sean Mirshafiei in a look into the future of Isola. Travis and Sean share insights into Isola’s strategy to serve the Quick Turn Market in North America with the opening of a new global headquarters and quick…
Isostack Tool Help – Central Panel
When multiple resins systems are used, a hybrid notification will appear. Checking the shield or mask check box will add surface finish and soldermask to the outer layers. Units in mils, mm and µm can be selected. The Zoom function will compress the stack up…