FR408HR Prepreg Supplemental

FR408HR Prepreg Supplemental

20 March 2024

Related Posts

These Circuit Materials Are Paving the Way to 6G
5G is Setting Stage for 6G
It seems like only yesterday, but Fifth Generation (5G) cellular networks have been making wireless connections for almost four years. Already, some of the major carriers and test-equipment developers are looking ahead to around 2029 or 2030 and the expected start of Sixth Generation (6G)…
A Tour of the New Isola Factory: Investing in North America
A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…
Pcb007
Heading Into 2020 with Isola
PCB007 interviews CEO Travis Kelly and CSMO Sean Mirshafiei in a look into the future of Isola. Travis and Sean share insights into Isola’s strategy to serve the Quick Turn Market in North America with the opening of a new global headquarters and quick…