An Assessment Of The Impact Of Lead Free Assembly Processes On Base Material And PCB Reliability
08 August 2016
Related Posts
A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…
Isola Lays Foundations for Faster Circuits at DesignCon 2022
Isola Group will be exhibiting at the upcoming DesignCon 2022 expo and conference. The event, scheduled for April 5-7, 2022, at the Santa Clara Convention Center (Santa Clara, CA), provides visitors with the chance to learn…
Isola to show unique RF and microwave circuit materials
At the European Microwave Exhibition in London, Isola will be providing guidance on the best use of its advanced circuit materials for printed circuit boards. Isola’s material experts and sales professionals, including new addition Jim Francey, will welcome visitors to learn about the optimum…